Works on building and roofing of the stands at the football pitch part 2
In the past month, both entrances to the fan sector were connected by a paved walkway made of cobblestones, and the area for the new stands was also prepared in a similar manner. This week, the roof structure was installed, which you can see in the attached photos. In the coming weeks, work should begin on installing the stands, which we hope will be ready for use in October.